• 补贴后售价25.98万元起 插电混动豪华SUV WEY P8上市 2019-05-21
  • 你说的确实不错!网友们自有公断! 2019-05-21
  • 2018年度大学生就业蓝皮书发布 高职就业率首次超本科生 2019-05-21
  • 刘延东:把孔子学院办成中南人民心灵的“彩虹桥” 2019-05-20
  • 紫光阁中共中央国家机关工作委员会 2019-05-20
  • 虾仁-热门标签-华商生活 2019-05-20
  • 候选企业:浙江吉利控股集团有限公司 2019-05-19
  • 《事业单位公开招聘分类考试公共科目笔试考试大纲解读》出版 2019-05-19
  • 第二届一带一路网络媒体责任论坛暨全国百家网络媒体总编看重庆 2019-05-19
  • 【中国梦·大国工匠篇】 “跨界”复苏失传百年工艺 蔺涛:坚守让古砚焕发新生 2019-05-18
  • 端午假期全国迎客8910万人次 传统文化活动受青睐 2019-05-18
  • 4名中国男子在泰涉网络赌球被抓 涉案金额约1亿元 2019-05-18
  • 寻根尧祖 圆梦中华——2018首届尧都民间祭拜尧帝大典在山西临汾尧都举行  2019-05-17
  • 劫匪持枪抢劫金店 川渝警方联动20小时破案 2019-05-17
  • 看得见的进步人民网试驾吉利帝豪GL 2019-05-17
  • ;

    Power System

    Tatung has been devoted to the manufacturing of industrial motors and related applications for many years and has the best project management team in order to offer high-quality and stable electronic products for our clients. “Customer and quality come first” is our commitment.

    Feature

    Power Generation Plant system

    A.Diesel power generatoring sets and auxiliary equipment turn-Key Project

    1.The largest output capacity diesel generator sets in Taiwan:
    The output capacity of diesel generator sets is 11,000 kW which is the largest in Taiwan Power Company.

    2.The largest quantity of diesel generating sets :
    The total quantity of diesel generator sets is 12 units.
    3. Ample space for maintenance of generator sets:
    The diesel generator sets are installed on 2nd floor in main equipment building. Ample space is reserved for maintenance.
    4.Easy Inspection and Maintenance:
    The layout of piping adopts elevated arrangement on the top of 1st floor for easy inspection and maintenance.

    5.Positive pressure Ventilation:
    The ventilation system has been installed to maintain positive pressure inside the site to prevent the ingression of the salty material. It will prolong the life span of the equipment.
    6.Conform to severe environmental regulations:
    Emissions limits for NOx are around 1200 ppm for island settings according to regulations. Measured values for this project are around 363 ppm; well within limits.

    B. Hydro power generator Set and Auxiliary Equipment turn-Key Project

    1.Coordinating and complying with national green energy policies. Tatung is playing an
    active role in power plant upgrades and water resource development Taiwan power company as well as private sector entities.

    2.The scope of supply is water turbine, generator and auxiliary subsystems shown as follows.
    - Governor control system
    - Hydraulic system
    - Air compressing system
    - Cooling water system
    - Water discharging system
    - Substation system
    - Power distribution system
    - Electricity charging system
    - Hoist equipment
    - Ventilation system - SCADA system

    Transmission & Distribution system

    1.Up to 345kV distribution substation turn-key projects.
    2.Civil works turn-key project:
    - Land surveying and preparation.
    3. Electro-mechanic turn-key projects:
    including power transformers, GIS,C-GIS, RCPDC panels, SCADAs, control panels, auxiliary equipment, cables, optic fibers, communication cables etc.
    4.Interface integration services on projects from planning, design,manufacture and installation to testing, maintenance and SCADA.
    Tatung provides high quality integration services for clients.

    Service

    1. Power Generation Plant Systems:

    Hydro/Diesel engine power generation system.

    2.Power Transmission and Distribution systems:

    Up to 345kV distribution substation turn-key projects.

    Main Achievements

    Power Plant System
    1.Diesel power generator sets & auxiliary equipment turn-key projects:
    -PENG-HU off-shore island: JIAN-SHAN, NIAO-YU, HU-JING, QI-MEI, WANG-AN, JI-BEI power plants.
    -KIN-MEN off-shore island: TA-SHAN, SIA-SING power plants.
    2.Hydro power generator sets & auxiliary equipment turn-key projects
    -Taiwan Power Company: BI-HAI, JHU-MEN, QING-LIU,SHUI-LIAN, BEI-SHAN, KAO-PING , RUAN-QIAO, SHE-LIAO power plants.
    -Taichung Irrigation Association:HOU-LI creek power plant.
    -JIA-NAN Co.: WU-SHAN-TOU power plant.
    Power Transmission and distribution system turn-key projects
    JANG-LIN, MA-LAN, SHOU-FENG, LU-ER, SHE-WAN D/S Substation, The Maanshan third nuclear power plant 161kV GIS & auxiliary equipment project for Taiwan Power Company.

    Contact Us

    Business lesson

      • Cadebce Hung

      • No.22, Sec. 3, Zhongshan N. Rd., Zhongshan Dist., Taipei City 104, Taiwan (R.O.C.)

    • Tel
      • 02-25984219

    • Email

    Business lesson

      • Anthony Tseng

      • No.22, Sec. 3, Zhongshan N. Rd., Zhongshan Dist., Taipei City 104, Taiwan (R.O.C.)

    • Tel
      • 02-25984299 ext.411

    • Email
  • 补贴后售价25.98万元起 插电混动豪华SUV WEY P8上市 2019-05-21
  • 你说的确实不错!网友们自有公断! 2019-05-21
  • 2018年度大学生就业蓝皮书发布 高职就业率首次超本科生 2019-05-21
  • 刘延东:把孔子学院办成中南人民心灵的“彩虹桥” 2019-05-20
  • 紫光阁中共中央国家机关工作委员会 2019-05-20
  • 虾仁-热门标签-华商生活 2019-05-20
  • 候选企业:浙江吉利控股集团有限公司 2019-05-19
  • 《事业单位公开招聘分类考试公共科目笔试考试大纲解读》出版 2019-05-19
  • 第二届一带一路网络媒体责任论坛暨全国百家网络媒体总编看重庆 2019-05-19
  • 【中国梦·大国工匠篇】 “跨界”复苏失传百年工艺 蔺涛:坚守让古砚焕发新生 2019-05-18
  • 端午假期全国迎客8910万人次 传统文化活动受青睐 2019-05-18
  • 4名中国男子在泰涉网络赌球被抓 涉案金额约1亿元 2019-05-18
  • 寻根尧祖 圆梦中华——2018首届尧都民间祭拜尧帝大典在山西临汾尧都举行  2019-05-17
  • 劫匪持枪抢劫金店 川渝警方联动20小时破案 2019-05-17
  • 看得见的进步人民网试驾吉利帝豪GL 2019-05-17