• 广西壮族自治区人民政府发布一批人事任免 2019-06-16
  • 哪个不在痛打落水狗呢 2019-06-16
  • 我相信“交警雨中护送高考生”是真,“交警雨中护送高考生”反被该高考生家长投诉是假。 2019-06-09
  • 金正恩对中国进行访问 2019-06-08
  • 党的自我革命是伟大社会革命的强大动力(深入学习贯彻习近平新时代中国特色社会主义思想) 2019-06-08
  • 勤劳只是致富的要素之一,生产力水平也是致富的要素之一。生产力水平低下导致农民勤劳却不能致富,因此,很多农民选择了进城打工。一个劳动力在刀耕火种的条件下,一年能够 2019-06-08
  • 头皮出油头屑严重 该怎么养发护发?-美食资讯 2019-06-08
  • 【访民情 惠民生 聚民心】驻村路上父女同行 2019-06-07
  • 生命的定格:有种担当叫“我是警察” 2019-06-07
  • 不动产登记全国联网 名下多少套房一查就知道 2019-06-07
  • TapTap今日恢复下载服务:整改三个月暴露内忧外患 2019-06-06
  • 孔宾的专栏作者中国国家地理网 2019-06-06
  • 提高合作水平 促进双赢发展 2019-06-05
  • 中国国青女排3-1越南取首胜 1胜1负卫冕之路艰辛 2019-06-05
  • 端午新经济体验无处不在 “指尖端午”玩出新花样 2019-06-05
  • ;

    Power System

    Tatung has been devoted to the manufacturing of industrial motors and related applications for many years and has the best project management team in order to offer high-quality and stable electronic products for our clients. “Customer and quality come first” is our commitment.

    Feature

    Power Generation Plant system

    A.Diesel power generatoring sets and auxiliary equipment turn-Key Project

    1.The largest output capacity diesel generator sets in Taiwan:
    The output capacity of diesel generator sets is 11,000 kW which is the largest in Taiwan Power Company.

    2.The largest quantity of diesel generating sets :
    The total quantity of diesel generator sets is 12 units.
    3. Ample space for maintenance of generator sets:
    The diesel generator sets are installed on 2nd floor in main equipment building. Ample space is reserved for maintenance.
    4.Easy Inspection and Maintenance:
    The layout of piping adopts elevated arrangement on the top of 1st floor for easy inspection and maintenance.

    5.Positive pressure Ventilation:
    The ventilation system has been installed to maintain positive pressure inside the site to prevent the ingression of the salty material. It will prolong the life span of the equipment.
    6.Conform to severe environmental regulations:
    Emissions limits for NOx are around 1200 ppm for island settings according to regulations. Measured values for this project are around 363 ppm; well within limits.

    B. Hydro power generator Set and Auxiliary Equipment turn-Key Project

    1.Coordinating and complying with national green energy policies. Tatung is playing an
    active role in power plant upgrades and water resource development Taiwan power company as well as private sector entities.

    2.The scope of supply is water turbine, generator and auxiliary subsystems shown as follows.
    - Governor control system
    - Hydraulic system
    - Air compressing system
    - Cooling water system
    - Water discharging system
    - Substation system
    - Power distribution system
    - Electricity charging system
    - Hoist equipment
    - Ventilation system - SCADA system

    Transmission & Distribution system

    1.Up to 345kV distribution substation turn-key projects.
    2.Civil works turn-key project:
    - Land surveying and preparation.
    3. Electro-mechanic turn-key projects:
    including power transformers, GIS,C-GIS, RCPDC panels, SCADAs, control panels, auxiliary equipment, cables, optic fibers, communication cables etc.
    4.Interface integration services on projects from planning, design,manufacture and installation to testing, maintenance and SCADA.
    Tatung provides high quality integration services for clients.

    Service

    1. Power Generation Plant Systems:

    Hydro/Diesel engine power generation system.

    2.Power Transmission and Distribution systems:

    Up to 345kV distribution substation turn-key projects.

    Main Achievements

    Power Plant System
    1.Diesel power generator sets & auxiliary equipment turn-key projects:
    -PENG-HU off-shore island: JIAN-SHAN, NIAO-YU, HU-JING, QI-MEI, WANG-AN, JI-BEI power plants.
    -KIN-MEN off-shore island: TA-SHAN, SIA-SING power plants.
    2.Hydro power generator sets & auxiliary equipment turn-key projects
    -Taiwan Power Company: BI-HAI, JHU-MEN, QING-LIU,SHUI-LIAN, BEI-SHAN, KAO-PING , RUAN-QIAO, SHE-LIAO power plants.
    -Taichung Irrigation Association:HOU-LI creek power plant.
    -JIA-NAN Co.: WU-SHAN-TOU power plant.
    Power Transmission and distribution system turn-key projects
    JANG-LIN, MA-LAN, SHOU-FENG, LU-ER, SHE-WAN D/S Substation, The Maanshan third nuclear power plant 161kV GIS & auxiliary equipment project for Taiwan Power Company.

    Contact Us

    Business lesson

      • Cadebce Hung

      • No.22, Sec. 3, Zhongshan N. Rd., Zhongshan Dist., Taipei City 104, Taiwan (R.O.C.)

    • Tel
      • 02-25984219

    • Email

    Business lesson

      • Anthony Tseng

      • No.22, Sec. 3, Zhongshan N. Rd., Zhongshan Dist., Taipei City 104, Taiwan (R.O.C.)

    • Tel
      • 02-25984299 ext.411

    • Email
  • 广西壮族自治区人民政府发布一批人事任免 2019-06-16
  • 哪个不在痛打落水狗呢 2019-06-16
  • 我相信“交警雨中护送高考生”是真,“交警雨中护送高考生”反被该高考生家长投诉是假。 2019-06-09
  • 金正恩对中国进行访问 2019-06-08
  • 党的自我革命是伟大社会革命的强大动力(深入学习贯彻习近平新时代中国特色社会主义思想) 2019-06-08
  • 勤劳只是致富的要素之一,生产力水平也是致富的要素之一。生产力水平低下导致农民勤劳却不能致富,因此,很多农民选择了进城打工。一个劳动力在刀耕火种的条件下,一年能够 2019-06-08
  • 头皮出油头屑严重 该怎么养发护发?-美食资讯 2019-06-08
  • 【访民情 惠民生 聚民心】驻村路上父女同行 2019-06-07
  • 生命的定格:有种担当叫“我是警察” 2019-06-07
  • 不动产登记全国联网 名下多少套房一查就知道 2019-06-07
  • TapTap今日恢复下载服务:整改三个月暴露内忧外患 2019-06-06
  • 孔宾的专栏作者中国国家地理网 2019-06-06
  • 提高合作水平 促进双赢发展 2019-06-05
  • 中国国青女排3-1越南取首胜 1胜1负卫冕之路艰辛 2019-06-05
  • 端午新经济体验无处不在 “指尖端午”玩出新花样 2019-06-05
  • 内蒙古快3开奖公告 切沃罗马 彩票中心主任 河北快三跨度走势图 美式轮盘免费试玩 拜仁慕尼黑vs霍芬海姆 幸运飞艇走势图软件计算 连环夺宝2电子游戏 彩票系统开发彩票app 广州恒大对墨尔本胜利